DAMAC Lagoons logo
Costa Brava at DAMAC Lagoons, official DAMAC hero

Sold out, delivered March 2026

Costa Brava at DAMAC Lagoons

Sold out, delivered March 2026. 1,049 townhouses and villas across two phases, 3 to 7 bedrooms, trading on the resale market.

  • 1,049 homes
  • 3 to 7 bedrooms
  • Completed March 2026
  • 1,496 registered sales
Read the facts

The project

Costa Brava overview

Costa Brava is the Catalonia themed townhouse and villa cluster in DAMAC Lagoons, Dubailand. Two phases, 1,049 homes, sold out and handed over on 1 March 2026. It trades on the resale market. This site is an independent marketing portal and is not official DAMAC.

Two phases, one build

Costa Brava 1 and Costa Brava 2

Costa Brava 1 has 555 units. Costa Brava 2 has 494 units. Both phases share the same sales start (13 December 2021), the same construction start (28 February 2022), the same completion date (1 March 2026), and the same 15 / 35 / 50 launch payment plan. Costa Brava 1 is recorded as sold out. Costa Brava 2 is also recorded as sold out. We publish sales status only, not a percent sold figure.

Costa Brava 2 unit mix
TypeUnitsShareSize
3 bedroom8617.4%2,030 sqft
4 bedroom24750.0%2,229 sqft
5 bedroom13427.1%3,111 to 3,152 sqft
6 bedroom132.6%4,972 to 14,234 sqft
7 bedroom142.8%7,250 sqft

A note on how the units are classified

The Dubai Land Department registry classifies most Costa Brava 1 townhouse stock as villa. The 2,229 sqft 4 bedroom unit appears in the Costa Brava 1 registry as a villa and in the Costa Brava 2 registry as a townhouse. The cause is now clear from the Santorini evidence: DAMAC's own floor plan documents label the same unit a townhouse in the sheet title and a villa in the drawing callout, and the registry inherits that inconsistency. Because of that, we publish Costa Brava 2 by bedroom count only, and a total unit count for Costa Brava 1. The unit types themselves come from DAMAC's own floor plans and cluster plan, which are unambiguous. Checked 6 September 2026. See also Santorini, where the same labelling conflict is documented in full.

Registered book

What the registered book shows

1,496 registered sale transactions (not homes), all time median AED 1.95 million. Last 12 months (28 April 2025 to 27 April 2026): 118 sales, median AED 2.80 million, rate AED 1,215 per sqft. Full tables live on the transactions page.

Our arithmetic: 1,496 registered sale transactions against 1,049 homes is roughly 1.43 transactions per home since sales opened in December 2021.

Rate comparison: The 4 bedroom townhouse launched at AED 763 per sqft in December 2021. The cluster's registered median rate over the last 12 months is AED 1,215 per sqft. The two are not like for like, because the second spans every unit type in the cluster rather than the 4 bedroom townhouse alone. Also see price appreciation.

Source: Dubai Land Department registered sales via ADREC. Residential sales only, land plots excluded, rate outliers filtered to AED 50 to 8,000 per sqft. Data through 27 April 2026. Last checked 6 September 2026.

Delivery record

Completed 1 March 2026

Sales opened on 13 December 2021. Construction started on 28 February 2022. Target completion was 29 July 2025. Actual completion was 1 March 2026, roughly seven months later than the target completion date. Construction status: Completed, 100 percent, both phases. Inspection reports on file: 10 on Phase 1 and 11 on Phase 2.

Homes and layouts

Townhouses and villas, 3 to 7 bedrooms

  • Rooftop access on the 5 bedroom and larger types
  • Garden water feature. The 3 and 4 bedroom middle unit plans label a children's water play area in the garden
  • Hammock flooring
  • Adrenaline Room, an extra bedroom at roof level on the LTH-5B and LV-3B plans

The roof level, the Adrenaline Room and the maid's room appear on the 5 bedroom and larger types only. The 3 and 4 bedroom middle units are two storey in the supplied drawings. See the floor plans page for all seven unit types.

Named plan feature

The Adrenaline Room

The Adrenaline Room is drawn and labelled on the LTH-5B and LV-3B plans as an extra bedroom at roof level. DAMAC presents it as convertible to a gaming room, a home cinema with screen projector, a climbing wall or a private gym. The plans show the climbing wall and screen projector marked in place. The roof level, the Adrenaline Room and the maid's room appear on the 5 bedroom and larger types only. The 3 and 4 bedroom middle units are two storey in the supplied drawings.

Amenities

As published in the DAMAC launch brochure, 2021

These are launch era commitments from a roughly five year old document. They are not verified as delivered.

Costa Brava specific

  • Adrenaline Hub
  • Ziplining across the water
  • Rock climbing
  • Aqua Wall wall climbing installation over water
  • Kayaking
  • Paddle surfing
  • Wave riding
  • Giant Swing
  • Suspended Tents in the trees
  • Indoor Snorkeling experience
  • Natural Water Ecosystem
  • Outdoor art galleries with botanical garden layouts
  • Flower walls
  • Geometrical gardens
  • F and B kiosks and seating sections
  • Independent boardwalk from villa to water
  • Hammock seating
  • Lagoon beach access

Community level

  • Retail Promenade
  • Clubhouse
  • Floating Cinema
  • Water playground
  • Wave Ride experience

Location

Drive times from the launch brochure

Costa Brava sits adjacent to the main DAMAC Lagoons hub, is accessed from Hessa Street, has its own water body, and is within minutes of Mohammed Bin Zayed Road, Emirates Road and Al Khail Road.

Schools

  • Jebel Ali School5 minutes
  • Fairgreen International School11 minutes
  • Global Indian International School16 minutes
  • Safa Community School18 minutes
  • Kings' School21 minutes

Healthcare

  • Aster Medical Centre9 minutes
  • Mediclinic Parkview Hospital12 minutes
  • NMC Royal Hospital19 minutes

Malls

  • First Avenue Mall11 minutes
  • City Centre Me'aisem14 minutes
  • Mall of the Emirates24 minutes

Hotels

  • Studio One Hotel9 minutes
  • Park Inn by Radisson10 minutes
  • Five Hotel Jumeirah Village Circle19 minutes

Sports and leisure

  • Dubai Polo and Equestrian Club10 minutes
  • The Plantation Equestrian and Polo Club11 minutes
  • Dubai Autodrome12 minutes
  • Miracle Garden13 minutes
  • Dubai International Stadium14 minutes
  • Global Village14 minutes
  • IMG World14 minutes
  • Hamdan Sports Complex15 minutes

Airport

  • Al Maktoum International Airport28 minutes

Drive times as published in the DAMAC Costa Brava brochure. DAMAC publishes slightly different figures on its website, see the note below. Actual times vary with traffic.

DAMAC publishes two sets of drive times. The figures above are from the Costa Brava brochure. DAMAC's website master plan article, updated 7 April 2026, gives slightly different numbers for some destinations, including 25 minutes to Al Maktoum International Airport against the brochure's 28. We use the project level source here and flag the difference rather than average the two. Checked 6 September 2026.

DAMAC Lagoons master plan

About the Developer

DAMAC Properties

DAMAC Properties is the developer of DAMAC Lagoons, including Costa Brava. Legal entity on file: Island Oasis Properties. DLD community: Al Hebiah Fifth, Dubai.

This website is an independent marketing portal and is not officially affiliated with DAMAC Properties. Official pages live on damacproperties.com.

Costa Brava FAQ

Is Costa Brava at DAMAC Lagoons still available?
No. Both phases are sold out and were completed on 1 March 2026. Costa Brava trades on the resale market. Primary developer stock is not available.
How many homes are there in Costa Brava?
1,049 across two phases. Costa Brava 1 has 555 units and Costa Brava 2 has 494.
What unit types were built in Costa Brava?
Seven types across 3 to 7 bedrooms: 3, 4 and 5 bedroom townhouses, and 5, 6 and 7 bedroom villas. The 7 bedroom villa is 7,250 sqft. The largest observed unit is a 6 bedroom villa of 14,234 sqft on an 18,988 sqft plot.
When was Costa Brava handed over?
Construction completed on 1 March 2026, roughly seven months after the target completion date of 29 July 2025. Construction started on 28 February 2022 and sales opened on 13 December 2021.
What was the Costa Brava payment plan?
15 percent deposit, 35 percent during construction and 50 percent on completion, across 13 milestones running to 30 months from the date of sale. There was no post handover plan. Resale purchases do not follow this schedule.
What do Costa Brava homes actually sell for?
1,496 registered sale transactions have been recorded, at an all time median of AED 1.95 million. Over the last 12 months there were 118 registered sales at a median of AED 2.80 million and AED 1,215 per sqft.

DAMAC Lagoons

Ask about Costa Brava resale

Get in touch for current pricing and availability. Your Costa Brava expert will be in touch with all the details.

Independent portal. Not officially affiliated with DAMAC Properties.